This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
Terminal Roadway Signage
2/11/2025
-
Savannah, Georgia
Savannah Airport Commission
The buyer is seeking proposals for Terminal Roadway Signage at Savannah/Hilton Head International Airport. The project involves designing, creating, and installing new signage for the terminal roadways. Bidders are required to submit proposals on provided forms and must thoroughly examine construction plans, specifications, and the project site. The buyer emphasizes equal opportunity for Disadvantaged Business Enterprises in the bidding process.
- 1/21/2025 - Pre-bid conference
- 2/11/2025 - Proposal Due Date
Refer to RFP
- Design and create terminal roadway signage
- Install new signage in designated areas
- Ensure compliance with airport regulations and standards
- Coordinate with airport operations for installation schedule
- Provide detailed plans and specifications for signage materials
- Conduct site surveys to determine optimal signage placement
- Develop wayfinding strategy for improved passenger navigation
- Create mock-ups or prototypes of proposed signage
- Obtain necessary permits for signage installation
- Implement any required electrical work for illuminated signs
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.