This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
Water System Master Plan and Hydraulic Model Development
City of Milton-Freewater
The buyer is seeking qualified engineering firms to develop a water system master plan and hydraulic model. The project involves creating a water system master plan, developing a hydraulic model, and running scenarios using the model. All work must comply with AWWA drinking water standards and meet Oregon state requirements, including OHA Drinking Water standards. The buyer emphasizes compliance with various state and federal regulations regarding workers' rights and compensation.
- 2/13/2025 - Proposal Due Date
- Develop a water system master plan
- Create a water system hydraulic model
- Run scenarios in the water system model
- Comply with American Water Works Association (AWWA) drinking water standards
- Meet Oregon Health Authority (OHA) Drinking Water standards
- Ensure compliance with Oregon Public Works Law
- Adhere to Federal and State statutes on Workers Compensation
- Follow regulations on Industrial Accident Insurance
- Comply with Income Tax Withholding requirements
- Adhere to Social Security regulations
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.