Landfill Equipment Storage Building
Gunnison County
The buyer is seeking a Construction Manager/General Contractor (CM/GC) for the design and construction of a landfill equipment storage building. The project includes developing construction documents, managing subcontractors, and implementing energy-efficient systems. The building will store and maintain heavy-duty landfill equipment, featuring geothermal heating and ventilation systems. The CM/GC will work collaboratively with the buyer to ensure the project meets budget and operational requirements.
- 3/3/2025 - Proposal Due Date
- 3/10/2025 - Selection of CM/GC
- 3/28/2025 - Execution of IGMP agreement and NTP
- 6/16/2025 - CM/GC Completes Design Phase
- 6/27/2025 - Guaranteed Maximum Price Agreement with CM/GC
- 7/14/2025 - CM/GC Commences Construction
- 12/31/2025 - Construction complete
- Provide Construction Manager/General Contractor (CM/GC) services for design and construction
- Develop schematic design documents and cost estimates
- Create final construction documents and obtain permits
- Manage subcontract solicitation and management
- Implement ground source (geothermal) heat pump system
- Design ventilation system with manual and automated controls
- Incorporate steel plates and tracks in concrete slab for heavy equipment
- Install fire suppression system and dedicated cistern
- Construct all-electric building using 2021 IBC and IECC codes
- Complete construction while maintaining landfill operations