Elam Road at Shepherd Lane Right Turn Lane Design
3/11/2025
-
Balch Springs, Texas
City of Balch Springs
The buyer is seeking a contractor to construct right-turn lane improvements at the intersection of Elam Road and Shepherd Lane. The project includes concrete pavement, curb and gutter, sidewalks, pedestrian ramps, and signal modifications. The work also involves traffic control, erosion control, and other related tasks. The project must be completed within 49 working days.
- 3/4/2025 - Pre-bid teleconference meeting
- 3/11/2025 - Proposal Due Date
Refer to RFP
- Construct right-turn lane on Elam Road
- Construct concrete pavement on Shepherd Lane
- Install traffic control devices and signage
- Perform excavation and embankment work
- Install drainage improvements
- Construct curb ramps and sidewalks
- Apply pavement markings and reflectors
- Implement erosion control measures
- Adjust existing utilities as needed
- Provide traffic control during construction