This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
GIS Software for Design and Management of Electric Infrastructure
3/12/2025
-
Denton, TX
City of Denton
The buyer is seeking a GIS solution for electric utilities that leverages ESRI's ArcGIS Utility Network platform. The system must provide comprehensive tools for managing and visualizing electrical infrastructure data within a map-centric interface. Key requirements include mobile and web applications, graphical work design tools, data management, visualization, analysis, and integration with existing systems. The project must be completed within 12 months of award.
- 3/3/2025 - Questions Deadline
- 3/12/2025 - Proposal Due Date
- Three years experience providing similar products or services
- Provide mobile field application with online/offline capabilities
- Develop web application for GIS visualization and asset management
- Create graphical work design application for construction plans
- Implement data management system for utility infrastructure
- Deliver visualization and mapping tools for electrical assets
- Provide analysis and reporting capabilities
- Develop network modeling tools for electrical distribution
- Integrate with existing third-party systems
- Migrate existing GIS data
- Provide training for up to 20 city employees
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.