The buyer requests proposals for Construction Manager at Risk services for the Lake Nona Reclaimed Water Storage and High Service Pump Facility Project. The project includes constructing a reclaimed water storage and repump facility on a 3-acre parcel. It will serve the Eastern Regional Reclaimed Water Distribution System and include a 24-inch transmission pipe.

  • 2/10/2025 - RFP Release Date
  • 2/17/2025 - Pre-Proposal Conference
  • 3/3/2025 - Question Deadline
  • 3/13/2025 - Proposal Due Date
  • Performed Construction Manager at Risk services on at least two wastewater/reclaimed water projects each with total cost of at least $10 million
  • Perform full project estimate at 90% before and after value engineering
  • Prepare detailed construction schedule
  • Review project plans and specifications for constructability and phasing
  • Facilitate utility coordination with local authorities
  • Develop bid package scopes and generate Guaranteed Maximum Price
  • Obtain all required construction permits and approvals
  • Ensure site safety and access to homes and businesses
  • Coordinate all testing & inspections
  • Finalize and close-out Project