This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
Howard F. Curren AWTP Junction Chamber No.1 Odor Control System Replacement Design
4/3/2025
$500,000-$800,000
Tampa, Florida
City of Tampa
The buyer seeks professional engineering services for the design of a replacement odor control system at the Howard F. Curren Advanced Wastewater Treatment Plant. The project focuses on Junction Chamber No. 1 within the 96-MGD capacity plant. The design must account for current average flows of 60 MGD and peak flows of 200 MGD. The buyer requires expertise in wastewater treatment processes and odor control technologies.
- 3/17/2025 - Pre-submittal Conference
- 4/3/2025 - Proposal Due Date
Refer to RFP
- Design replacement odor control system for Junction Chamber No. 1
- Evaluate current wastewater treatment plant operations and capacity
- Analyze peak flows and annual average daily flows
- Consider two-stage, high rate pure oxygen and fine bubble aeration systems
- Ensure compatibility with existing activated sludge biological nitrification/denitrification processes
- Design for AWT, high-level disinfected and de-chlorinated effluent discharge
- Assess impact on Hillsborough Bay discharge
- Coordinate with existing plant emergency notification software
- Prepare detailed engineering drawings and specifications
- Develop cost estimates for implementation
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.