This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.

Preliminary Engineering Phase Services, Safe Route To School & Pedestrian Safety Project

4/3/2025
-
West Covina, California

City of West Covina

Buyer is seeking professional engineering services for the Preliminary Engineering (PE) Phase of a Safe Route to School & Pedestrian Safety Project. The project aims to improve pedestrian safety and walking/biking routes to schools in West Covina. This is a lump sum award with a project duration of 1 year.

  • 3/13/2025 - Bid Posting Date
  • 3/27/2025 - Q&A Deadline
  • 4/3/2025 - Proposal Due Date
Refer to RFP
  • Conduct pedestrian safety assessments around schools
  • Design safe walking and biking routes to schools
  • Develop preliminary engineering plans for safety improvements
  • Coordinate with school district stakeholders
  • Conduct traffic studies in school zones
  • Create cost estimates for safety infrastructure
  • Prepare environmental documentation for pedestrian improvements
  • Develop construction phasing plans minimizing school disruption
  • Design ADA-compliant pedestrian facilities
  • Create engineering specifications for traffic calming measures

Want to Save Time Drafting Proposals?

We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.

Book Demo