Construction Management Services for UMMC Gudelsky Emergency Power Upgrade Project

4/22/2025
-
Baltimore, MD

University of Maryland Medical System

Buyer seeks construction management services for upgrading emergency power at the Gudelsky Building. The project involves phased replacement of three emergency generators at the roof level while maintaining critical hospital operations. Work includes installing one 13.2kV, 2MW emergency generator and two 480V, 2.0MW generators with necessary switchgear modifications. The project must coordinate with the construction of the UMMC Stoler CAM project and have two generators fully functional by November 1, 2026.

  • 4/3/2025 - Initial Response Deadline
  • 4/7/2025 - Pre-bid Meeting and Walkthrough
  • 4/10/2025 - Questions Deadline
  • 4/15/2025 - Owner Responses to Questions Due
  • 4/22/2025 - Proposal Due Date
  • 4/25/2025 - Anticipated Award
Refer to RFP
  • Replace three emergency generators located at roof level of Gudelsky Building
  • Coordinate phased generator replacements to maintain hospital emergency power
  • Install new 13.2kV, 2MW emergency generator to feed North Hospital
  • Install two 480V, 2.0MW emergency generators with refeeding to existing paralleling gear
  • Coordinate outages with UMMS and UMMC Facilities Team
  • Manage storage and delivery of generator sets to project site
  • Rent crane and lift equipment for removal and installation of generators
  • Obtain permits for street/public right-of-way closures for crane operations
  • Perform load bank testing with connecting cables after each genset installation
  • Ensure compliance with EPA Emissions standards for emergency generators
  • Complete construction while coordinating with UMMC Stoler CAM project
  • Maintain 25% Women and Minority Business Enterprise participation
  • Conduct demolition and modifications of electrical, mechanical, plumbing systems
  • Perform rigging operations in building penthouse for generator replacement
  • Coordinate schedule to meet critical November 1, 2026 operational deadline
  • Manage exterior façade, electrical, mechanical, plumbing, and life safety work
  • Modify existing paralleling switchgear for controls and synchronization
  • Complete three separate and independent generator lift phases
  • Ensure adherence to UMMC MEP Standards - 2023 Edition
  • Execute project with AIA A102-2017 contract form with guaranteed max price