This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.

Pavement Preservation on Route 3

5/13/2025
$21,007,000.00
Burlington to Tyngsborough, MA

Massachusetts Department of Transportation Highway Division

Buyer seeks contractor for pavement preservation on Route 3 from Burlington to Tyngsborough. The project includes resurfacing mainline and ramps, bridge deck repairs, guardrail upgrades, and drainage improvements. Work must be performed at night between 9:00 PM and 5:00 AM. The project spans 20.674 miles and requires coordination with adjacent construction projects.

  • 3/15/2025 - Pre-Construction Meeting
  • 5/13/2025 - Proposal Due Date
  • Must be pre-qualified by Department in HIGHWAY-CONSTRUCTION or PAVEMENT-SURFACING categories
  • Project Scheduler with minimum five years CPM scheduling experience
  • Labor participation goals: 15.3% minorities and 6.9% women
  • Resurfacing Route 3 mainline and Exit 72B SB off-ramp
  • Fine milling pavement 0.75 inches deep
  • Installing ultrathin bonded overlay polymer pavement
  • Applying high-performance crack sealer and fog seal on shoulders
  • Replacing standard guardrail end treatments with MASH-compliant w-beam
  • Bridge milling and resurfacing with Superpave courses
  • Performing full and partial depth bridge deck repairs
  • Upgrading ITS and TDC equipment on Route 3
  • Placing pavement markings and tree trimming
  • Coordinating with active adjacent construction projects

Want to Save Time Drafting Proposals?

We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.

Book Demo