This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
Pavement Preservation on Route 3
5/13/2025
$21,007,000.00
Burlington to Tyngsborough, MA
Massachusetts Department of Transportation Highway Division
Buyer seeks contractor for pavement preservation on Route 3 from Burlington to Tyngsborough. The project includes resurfacing mainline and ramps, bridge deck repairs, guardrail upgrades, and drainage improvements. Work must be performed at night between 9:00 PM and 5:00 AM. The project spans 20.674 miles and requires coordination with adjacent construction projects.
- 3/15/2025 - Pre-Construction Meeting
- 5/13/2025 - Proposal Due Date
- Must be pre-qualified by Department in HIGHWAY-CONSTRUCTION or PAVEMENT-SURFACING categories
- Project Scheduler with minimum five years CPM scheduling experience
- Labor participation goals: 15.3% minorities and 6.9% women
- Resurfacing Route 3 mainline and Exit 72B SB off-ramp
- Fine milling pavement 0.75 inches deep
- Installing ultrathin bonded overlay polymer pavement
- Applying high-performance crack sealer and fog seal on shoulders
- Replacing standard guardrail end treatments with MASH-compliant w-beam
- Bridge milling and resurfacing with Superpave courses
- Performing full and partial depth bridge deck repairs
- Upgrading ITS and TDC equipment on Route 3
- Placing pavement markings and tree trimming
- Coordinating with active adjacent construction projects
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.