This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
Creekbed Infrastructure Rehabilitation CMAR Project
District of Columbia Water and Sewer Authority
Buyer is seeking a Construction Manager at Risk (CMAR) for the Creekbed Infrastructure Rehabilitation project. The contract term is 4 years with a 10% DBE/WBE utilization goal for pre-construction services. Buyer operates extensive water distribution and wastewater collection infrastructure serving DC residents and visitors, plus wholesale wastewater treatment for surrounding counties. The project will rehabilitate critical infrastructure components within the buyer's service area.
- 1/30/2025 - Pre-Proposal Conference
- 2/6/2025 - Question Deadline
- 5/1/2025 - Issue Date
- 8/8/2025 - Proposal Due Date
- Provide Construction Manager at Risk (CMAR) services
- Rehabilitate creekbed infrastructure systems
- Develop pre-construction services plan
- Coordinate with multiple county stakeholders
- Ensure compliance with DBE/WBE inclusion requirements
- Manage rehabilitation of wastewater collection systems
- Coordinate with existing water distribution networks
- Implement environmental protection measures
- Manage construction safety protocols
- Develop cost estimates for rehabilitation work
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.